Status | File | Tanggal | Shift | No Unit | Type Plan | Remarks | Image Upload |
---|---|---|---|---|---|---|---|
Close | Klik Report | 30-Dec-24 | DS | MD029 | Inspection | ||
Open | 30-Dec-24 | DS | MD028 | Inspection | |||
Close | Klik Report | 30-Dec-24 | DS | MD027 | Inspection | ||
Close | 30-Dec-24 | DS | MD026 | Inspection | Breakdown | ||
Close | Klik Report | 30-Dec-24 | DS | MD001 | Inspection | ||
Close | 29-Dec-24 | DS | MD025 | Inspection | Breakdown | ||
Close | 29-Dec-24 | DS | MD022 | Inspection | |||
Close | 29-Dec-24 | DS | MD021 | Inspection | |||
Close | 28-Dec-24 | DS | MD020 | Inspection | Breakdown | ||
Close | 28-Dec-24 | DS | MD019 | Inspection | Breakdown | ||
Close | 28-Dec-24 | DS | MD012 | Inspection | Breakdown | ||
Close | 28-Dec-24 | DS | MD018 | Inspection | Breakdown | ||
Open | 27-Dec-24 | DS | MD019 | Breakdown Plan | Follow Up SOS. Trace Water Pada Sampel Oli Tetapi Masih Negatif. Coolant Yang Berlebihan Masuk Kedalam Oil, Hal Ini Ditunjukkan Dengan Tingginya Nilai Na. Kemungkinan Terjadi Kerusakan Pada Seal Water Pump, Cylinder Head Retak/Bengkok Atau Gasket Rusak. Elemen Fe Meningkat, Mengindikasikan Keausan Abnormal Terjadi Pada Pump, Cylinder Liners Atau Valve Trains, Disarankan Memberhentikan Unit Dengan Segera Untuk Perbaikan. Segera Cari Sumber Masuknya Cairan Pendingin, Periksa Kekurangan Coolant. Periksa Kerusakan Seal Water Pump, Periksa Kebocoran Pada Cylinder Head Gasket/Seal. Periksa Valve Mechanism, Tekanan Oli Dan Suara Yang Tidak Normal. Segeralah Lakukan Perbaikan. Ambil Sampel Kembali Setelah Pemakaian Oli Mencapai 100 Jam Untuk Memonitor. Buka Potongan Filter Dan Inspek Partikel Besar. Bilas Kompartemen Untuk Menghilangkan Kontaminan. | ||
Open | 27-Dec-24 | DS | MD001 | Breakdown Plan | Follow SOS Engine. Meningkatnya Elemen Na Mengindikasikan Coolant Masuk Ke Dalam Oli. Indeks Pq Meningkat. Mengindikasikan Keausan Abnormal Terjadi Pada Pump, Cylinder Liners, Valve Trains, Atau Kenaikan Index Pq Berasal Dari Sampel Yang Diambil Tidak Sesuai Prosedur. Elemen Lainnya Normal. Disarankan Untuk Menemukan Sumber Dari Masuknya Coolant. Periksa Tingginya Penggunaan Coolant. Sebaiknya Segera Periksa Valve Mechanism, Tekanan Oli Dan Suara Yang Tidak Normal. Segera Lakukan Perbaikan. Ganti Oli Dan Filter, Ambil Sampel Kembali Setelah Pemakaian Oli Mencapai 100 Jam Untuk Memonitor. | ||
Open | 27-Dec-24 | DS | MD030 | Breakdown Plan | Follow Up SOS Engine. Ausan Pb dibatas normal kemungkinan berasal dari Crankshaft Bearing/Metal (Main & Crankpin/Auxiliary), Camshaft bushing, Bushing turbocharger, thrust metal. Pelumas telah diganti. Cek abnormal noise. Cek adanya benda asing dan ausan logam, cutting oil filter. Cek umur engine. Resampling 250 jam berikutnya untuk monitoring | ||
Open | 27-Dec-24 | DS | MD029 | Breakdown Plan | Follow Up SOS Engine. Soot diatas normal. Indikasi pembakaran yang tidak sempurna. Pelumas sudah diganti. Cek apakah unit sering dalam kondisi idling dalam waktu yang panjang (max 10% dari total engine running hours). Cek pre cleaner condition. Cek kondisi air cleaner element (clogging atau lembab). Resampling 250 jam berikutnya untuk monitoring. | ||
Close | 26-Dec-24 | DS | MD031 | Inspection | Unit Di Pelabuhan | ||
Close | 26-Dec-24 | DS | MD039 | Inspection | Unit di pelabuhan | ||
Close | 26-Dec-24 | DS | MD040 | Inspection | |||
Close | 26-Dec-24 | DS | MD011 | Inspection | Breakdown | ||
Close | 25-Dec-24 | DS | MD001 | Inspection | |||
Close | 25-Dec-24 | DS | MD037 | Inspection | |||
Close | 25-Dec-24 | DS | MD036 | Inspection | |||
Close | 25-Dec-24 | DS | MD029 | Inspection | |||
Close | 24-Dec-24 | DS | MD033 | Inspection | |||
Close | 24-Dec-24 | DS | MD032 | Inspection | |||
Close | 24-Dec-24 | DS | MD030 | Inspection | |||
Close | 24-Dec-24 | DS | MD016 | Inspection | Breakdown | ||
Close | 25-Dec-24 | DS | MD038 | Inspection | Part Backlog Ready. Check list part to admin | Klik | |
Close | 23-Dec-24 | DS | MD028 | Inspection | |||
Close | 23-Dec-24 | DS | MD027 | Inspection | |||
Close | 23-Dec-24 | DS | MD026 | Inspection | Breakdown | ||
Close | 23-Dec-24 | DS | MD001 | Inspection | |||
Close | 23-Dec-24 | DS | MD011 | PM Service | Install Box Ripper | ||
Open | 22-Dec-24 | DS | MD036 | PM Service | PM OK, Inspection Waiting Info. | ||
Close | 22-Dec-24 | DS | MD025 | Inspection | Breakdown | ||
Close | 22-Dec-24 | DS | MD022 | Inspection | |||
Close | 22-Dec-24 | DS | MD021 | Inspection |